期刊文献+

尼铁奥绍搏~瓜哇达段铁路沿线河流设计暴雨洪峰流量影响因素分析

Analysis of Influence Factors on Design Rainstorm Flood Peak Flow of Rivers along Oshogbo~Gwada Section of Nigeria Railway
下载PDF
导出
摘要 尼铁现代化铁路项目是尼日利亚国家铁路重点建设项目,其中Oshogbo至Gwada段河流水系发达,河流纵横。影响河流设计暴雨洪峰流量的自然地理因素较多,归纳起来主要有气候、暴雨、土质、土壤、植被及地形。该文详细介绍分析各自然地理单项因素的特征及其对河流暴雨洪峰流量的影响,总结沿线河流暴雨洪峰流量的特征、设计暴雨洪峰流量计算参数的计算方法及其取值。 Nigeria Modernized Railway Project is the key construction project of Nigeria railway. In the section from Oshogbo to Gwada, the water system of the rivers is flourishing and the rivers are in length and breadth. There are many natural geographic factors to influence the design rainstorm flood peak flow of the rivers. The collected factors are mainly the climate, rainstorm, soil, vegetation and terrain. The article introduces and analyzes in detail the characters of every single factor of the natural geography and its influence on the rainstorm flood peak flow of rivers, sums up the characters of rainstorm flood peak flow of the rivers along the railway, and its calculation parameter method and its data of the design rainstorm flood peak flow.
作者 许云生
出处 《城市道桥与防洪》 2008年第8期48-53,共6页 Urban Roads Bridges & Flood Control
关键词 尼铁现代化铁路项目 设计暴雨洪峰流量 影响因素 参数特征值分析 Nigeria Modernized Railway Project, design rainstorm flood peak flow, influence factor, analysis of parameter character value
  • 相关文献

参考文献2

  • 1小流域暴雨径流研究组..小流域暴雨洪峰流量计算[M].北京:科学出版社,1978.
  • 2铁道部第三勘测设计院主编..铁路工程设计技术手册 桥渡水文[M].北京:中国铁道出版社,1993:574.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部