根据泽城水电站坝址处工程地质条件和地形条件,在综合考虑建筑材料条件、施工经验和技术的基础上,就坝体分区、坝料平衡、面板趾板及接缝、坝基防渗、观测设计等进行了深入的研究和探讨。
According to the engineering geological condition and topographic condition of the dam site of Zecheng Hydropower Station, and based on the comprehensive consideration about the building material conditions, construction experiences and techniques, this paper researches and probes into the dam zoning, dam material balance, face slab and toe slab and juncture, dam foundation seepage prevention, and observation design, etc.