摘要
结合某热电厂配套热力管线工程的地质情况,分析浅埋暗挖隧道施工过程中出现坍塌的原因,提出了坍塌的预控措施和对策。
Based on the geological distribution of thermal pipelines for a thermoeletrical plant, the collapse reasons are analyzed in shallow tunneling. Some pre-controls and Countermeasures are presented for solving the collapse problem.