摘要
通过对水口水电站大坝低温混凝土现场测温结果的统计分析,阐述夏季混凝土浇筑时的温度控制与实施情况,进而寻求动态、定量控制浇筑温度的途径。
Based on the statistical analysis on the field temperature measurement results of low temperature dam concrete for Shuikou Hydropower Station,this paper describes the temperature control and implementation situation when the concrete is poured in summer.And then it puts forward the method of controlling the concrete pouring temperature dynamically and quantitatively.
出处
《水力发电》
EI
北大核心
1997年第4期24-28,共5页
Water Power
关键词
水电站
温控标准
低温混凝土
加冰率
混凝土施工
Shuikou Hydropower Station,temperature control standard,low temperature concrete,ice mixture ratio