摘要
苏只水电站枢纽布置考虑充分利用公伯峡水电站资源优势,枢纽布置因地制宜、简洁实用,主要建筑物特点突出,设计优化成果效益显著,首台机组发电工期居国内同等规模先进水平,体现了"以大带小"建设优势。
Making good use of the resource advantage of Gongboxia hydropower project, the layout of Suzhi project structures is simple and practical in line with local conditions, the main structures have conspicuous features, and the benefits of optimal design results are remarkable. The commissioning period of the first unit is at the advanced level among similar projects in China, highlighting the construction advantage of "large station promoting small one".
出处
《西北水电》
2008年第2期13-15,共3页
Northwest Hydropower