期刊文献+

沸石床快速渗滤工艺性能研究 被引量:1

Study on the zeolite constructed rapid infiltration system
下载PDF
导出
摘要 对人工快渗系统CRI进行了模拟实验。研究结果表明,CRI对COD、氨氮有较好的去除效果;在有机负荷0.2-0.6 kg COD/(m^3.d)、水力负荷周期1-2.5 d和湿干比2∶1-1∶3的适宜工艺条件下,COD去除率达到70%-90%,氨氮去除率达到90%;增大水力负荷周期和减小湿干比都有利于COD的去除。 Simulation experiment is made, and the results show that the removal rate of COD is 70% to 90% under the organic loading of 0.2-0. 6 kg COD/(m^3 . d) and the hydraulic loading cycle 1-2.5 d with the ratio of the flooding period to the drying period being 2 : 1-1 : 3. The removal rate of NH3N reaches 90%. Increasing the hydraulic loading cycle and decreasing the ratio of the flooding period to the drying period are favorable for removal of COD.
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 北大核心 2008年第1期109-111,共3页 Journal of Hefei University of Technology:Natural Science
基金 国家自然科学基金资助项目(40672154)
关键词 人工快渗系统 天然沸石 有机负荷 脱氮 constructed rapid infiltration(CRI) system zeolite organic loading denitrification
  • 相关文献

参考文献10

二级参考文献26

共引文献120

同被引文献9

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部