摘要
本文简要介绍了作者在执行中国援刚果共和国西比蒂(Sibiti)和莫萨卡(Mossaka)两城镇供水项目中所采用的技术路线、工作方法及取得的主要成果。认为:在地质条件复杂、资料缺少的情况下,正确的技术路线、有效的技术方法和合理的作业方案,是依靠科学技术获取最佳技术经济效果的关键环节。
The technical line and operating methods adopted as well as main results obtained in the water supply project in Sibiti and Mossaka towns of the Republic of Congo constructed by China are briefly introduced in this paper. The authors have considered that the correct technical line, effecient technical methods and suitable operating program are the key link to obtain the best technical economic results depending on the science and technology under the complex of geological conditions and in the absence of geological data.
出处
《河南地质》
1997年第3期200-205,共6页
Henan Geology
关键词
刚果共和国
找水
打井
供水工程勘测
城镇供水
The Republic of Congo, Sibiti, Mossaka, water research, open a well, technical line, operating method, result