白山抽水蓄能电站施工期水库调度

Reservoir operation of Baishan Pumped Storage Hydropower Station during construction period
下载PDF
导出
摘要 白山抽水蓄能电站主体工程施工期历时3年,经历了3个汛期,2005年春夏连汛,降水集中,来水特丰,同时施工进入到了关键时期,防汛与施工的矛盾非常突出。在2005年汛期施工中对水库调度进行了合理的优化,保证了工程的顺利进行。 The main works of Baishan Pumped Storage Hydropower Station is constructed for three years with three flood periods ; for which the precipitation is quite centralized with abundant inflow during the closely successive spring and summer flood period in 2005, however, the construction is just in a key period at that time, and then the contradiction between the flood control and the construction is quite prominent. The reasonable optimized operation of the reservoir during the period, which ensures the smoothly construction of the project, is described herein.
出处 《水利水电技术》 CSCD 北大核心 2008年第6期78-80,共3页 Water Resources and Hydropower Engineering
关键词 汛期施工 水库调度 白山抽水蓄能电站 construction during flood period reservoir operation Baishan Pumped Storage Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部