金川公司尾矿库坝体浸润线有限元模拟分析 被引量:1

Analysis of Finite Element Method by Simulation on One Tailing Dam Saturation Line
下载PDF
导出
摘要 应用有限元分析某尾矿坝的浸润线,认为(1)尾矿坝浸润线与放矿滩长有关系,随着放矿滩长加大,浸润线远离砂砾石坝体.从有限元模拟情况可知放矿滩长大于70 m时各工况下浸润线不在坝趾出露,这时坝体是稳定的.(2)对于建在透水性强的坝址上的尾矿坝,坝体的填筑高度对浸润线在坝趾出露影响不明显. Saturation line is the lifeline of tailing dam. This article analyzes one tailing dam saturation line by finite element method, the conclusions are. (1)The tailing dam saturation line is related with the drawing beach length, with the beach length increasing, the saturation line become far from the grit dam body. When beach-length is more than 70 meters the saturation line away from the dam's foot according to the conclusion of finite element simulation, the dam is stable. (2) The tailing dam is built on the strong water penetration site, the dam's height influences saturation line isn't distinct in the dam's foot.
出处 《甘肃科学学报》 2008年第2期57-59,共3页 Journal of Gansu Sciences
基金 中国地质调查局科研项目(1212010540402)
关键词 浸润线 有限元 稳定性 saturation line finite element stability
  • 相关文献

参考文献8

二级参考文献35

共引文献107

同被引文献11

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部