EPC总承包项下的采购分级管理方案研究 被引量:4

On Classification Scheme for Procurement Management in EPC Mode
下载PDF
导出
摘要 设计采购施工(EPC)总承包是项目管理的重要形式.本文主要分析了EPC总承包模式下设备和材料采购分级管理的原则及方法,研究了在项目建设过程中采购方对承包商进行合理监督的质量控制方法.结合作者分管的工作,本文提出了总承包项下设备和材料采购的重要性分级方法,建立了分级采购管理的程序.本文还指出了设备和材料采购分级监督的具体内容以及实施过程中可能出现的问题及协调方法.论文提出的、基于经验的发挥业主和EPC承包商各自的优势、促进他们之间的协作的思路与方法对改进项目管理质量具有现实意义. Engineer-Procure-Construct (EPC) is a main method of project management. This paper introduces the plan and fundamental of the classification scheme for procurement management in EPC mode and studies quality control of procumbent with the owner's proper supervision during the project implementation. With the author's experiences, this paper presents a classified method for equipment and material procurement and then sets up the classification procedure. This paper also indicates the application details, potential problems, and coordination method during the process of grading procurement. The concept, encouraging the owner and contractor to cooperate with each other and taking advantage of them, improves the quality of project management to some extent.
作者 赵宁
出处 《交通运输系统工程与信息》 EI CSCD 2008年第3期137-141,共5页 Journal of Transportation Systems Engineering and Information Technology
关键词 采购管理 分级采购 EPC 实施方案 procurement management grading procurement Engineer-Procure-Construct(EPC) implementation
  • 相关文献

参考文献5

二级参考文献5

共引文献118

同被引文献36

  • 1马骅.国际工程项目管理(四)——国际工程EPC项目的采购管理[J].石油工程建设,2005,31(3):58-61. 被引量:12
  • 2AHMED, TANVEER N, RUWANPURA, et al. Predicting schedule and cost elements' Variation for EPC projects in A1- berta[R]. Construction Research Congress 2005 ..BroadeningPerspectives-Proceedings of the Congress,2005 : 757-766. 被引量:1
  • 3ARNONI, YORAM (JERRY). Engineer procure and con- struct (EPC) project management compared to corporatemanagement and total quality management[R]. Proceedings of the Project Management Institute Annual Seminar Sym-posium, 1991 : 797-804. 被引量:1
  • 4GRYNBAUM,JOSEPH. Alliance contracting eliminates the risks of EPC contracts[J]. Power Engineering(Barrington,Illinois), 2004,108(7) : 56-60. 被引量:1
  • 5YEO K T, NING J H. Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects[J] International Journal of Project Management, 2002,20(4):253 262. 被引量:1
  • 6IRANMANESH H, JALILI M, PIRMORADI ZH. Develo- ping a new structure for determining time risk priority using risk breakdown matrix in EPC projects[R]. 2007 IEEE In- ternational Conference on Industrial Engineering and Engi-neering Management, 2007. 被引量:1
  • 7CHEN, MARK T. Applying the high performance work team to EPC[R]. AACE International: Transactions of theAnnual Meeting, 2002. 被引量:1
  • 8MAHMOUD~JOUINI, SIHEM BEN, MIDLER, et al. Time- to-market vs. time-to-delivery managing speed in engineer- ing,procurement and construction projects[J]. InternationalJournal of Project Management, 2004,22 (5) : 359-367. 被引量:1
  • 9BACK W E, MOREAU K A. Cost and schedule impacts of information management on EPC process[J]. Journal ofManagement in Engineering,2000,16(2):59-70. 被引量:1
  • 10I.I, JI, MOSELHI, et al. Internet-based database manage- ment system for proiect control[J]. Engineering,Construc- tion and Architectural Management,2006,13(3) :242-253. 被引量:1

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部