三峡电站机组台数多,单机容量大,电站进水口前的泥沙淤积及防漂物问题复杂。结合三峡工程枢纽总体布置,经过多年的论证研究和模型试验,采用在电站进水口前缘设置排沙、排漂孔的方法,解决了防沙及防漂问题。对厂房的布置及结构作了简要介绍。
Three Gorges Power Station is equipped with 26 generating units of large unit capacity. Prevention of sedimentation and floating debris in front of the intakes is a complicated problem. Based on results from several years of research and model test, sediment flushing outlets and floating debris sluices are provided in combination with the general layout of the Three Gorges Project to solve the problem on sedimentation and floating debris. The layout and structure of the powerhouse are briefly presented.
出处
《人民长江》
北大核心
1997年第10期10-12,共3页
Yangtze River
关键词
水电站
厂房
建筑物
三峡工程
总体布置
Arrangement of waterpower house Prevention and control of sediment Sediment ejection Sanxia Multipurpose Project