摘要
针对小煤窑采空区的特点及对铁路路基工程的危害,结合几条线铁路路基小煤窑采空处理的成功经验,提出在不同地层、工程地质及水文地质条件下,小煤窑采空处理的几种方法,以供大家参考。
Aiming at the characters of the small kiln goal area and the damage of railway foundation project and combined with the successful managing experience of the small kiln goaf of several railway foundations, it puts forward some kinds of managing method of the small kiln goal in different layer, project ecological and hydrographic ecological condition, to supply discussion to people.
出处
《山西建筑》
2008年第17期306-308,共3页
Shanxi Architecture
关键词
小煤窑
采空区变形
处理措施
small kiln, goal area deformation, management step