摘要
本文从三个方面介绍了5MW 核供热站的调试。这三个方面是:调试文件的制定、调试的实施以及几个重要的试验。
In this paper the commissioning of the 5MW nuclear District heating Pla-nt of Tsinghua University is briefly introduced in three aspects,namely:theworking out of the commissioning document,performance of the commissioningand some important tests.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1990年第5期24-31,共8页
Nuclear Power Engineering
关键词
核供热站
调试
5MW
5MW nuclear district heating plant
Commissioning