通过石太客运专线桥梁挖井基础混凝土的施工,总结出了高速铁路大体积混凝土的施工工艺、施工方法及其注意事项,为同类条件的施工积累了经验和指导性数据。
Through the construction of the digging well foundation concrete of the bridge of Shi-Tai passenger dedicated line,the author summarizes the construction technology,the construction method and the points for attention,which accumulates the construction experience and the instructive data for the similar projects.
出处
《山西建筑》
2008年第16期334-335,共2页
Shanxi Architecture
关键词
大体积混凝土
施工
温控技术
mass concrete,construction,temperature control technology