圆满贯水电站拱坝泄洪消能问题的试验研究 被引量:1

Experimental study on energy dissipation for arch dam in Yuanmanguan power station
下载PDF
导出
摘要 利用水工水力学模型试验研究方法对圆满贯工程泄洪消能问题进行研究分析同时,为百米级拱坝在五表孔布置方面,提供了一种全新的泄洪消能工体型与设计思路,即采用宽尾墩窄缝纵向水舌与连续鼻坎横向扩散的布置形式,可以使水舌在纵向与横向实现全范围的扩散,消能率提高,适应不同运行方式需要的同时,缩短了RCC拱坝施工工期,节约了工程总投资。 The experimental study on energy dissipation for Yuanmanguan Power Station was car-ried out by the hydraulic model test, put forward a new energy dissipator style and its designing method on five crest spillway flood for arch dam. The new energy dissipator is constituted by flaring gate pier and deflector bucket. Spillway flow would be spreaded in cross and longitude. Energy dissipation ratio would be increased, the period of RCC arch dam construction and gross engineering investment would be reduced.
出处 《水资源与水工程学报》 2008年第2期85-87,共3页 Journal of Water Resources and Water Engineering
关键词 拱坝 消能 冲坑深度 arch dam energy dissipation the depth of scouring pit
  • 相关文献

参考文献3

共引文献2

同被引文献8

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部