摘要
结合太原某花园1号楼工程概况,阐述了湿法搅拌桩工艺流程,对测量放线、深层搅拌机的定位、水灰比控制、材料质量控制等关键工序控制进行了详细介绍,并就如何提高工程质量作了探讨,以供参考借鉴。
Combined with the project general situation of one garden 1# building Taiyuan city, it represents the technological progress of wet mixing pile, introduces the control of the key progress of measuring paying off, the location of deep mixing pile, the control of the ration of water and concrete, material quality control, and discusses how to increase the project quality to supply reference.
出处
《山西建筑》
2008年第10期120-121,共2页
Shanxi Architecture
关键词
湿法搅拌桩
施工质量
测量放线
设计参数
wet mixing pile, construction quality, measure paying off, design parameter