摘要
使用TK-2D软件建立了瓯江口海区潮流泥沙数学模型,采用潮流泥沙数学模型模拟计算手段,对洞头峡4种围垦工程方案的可行性进行了初步研究,从潮流泥沙角度对洞头峡围垦工程的可行性进行了分析论证。研究结果表明,洞头峡4种围垦方案都是可行的,从对周围海区环境影响和资源可持续利用角度考虑,以保留现有岛间通道进行围垦为佳。
TK-2D software is used to set up tidal current and sediment mathematical models of the Oujiang estuary. By means of tidal current and sediment numerical simulations, elementary studies are carried out on the feasibility of four reclamation project schemes in Dongtouxia channel, and analyses and demonstration are made on their feasibility from the point of view of tidal current and sediment. The study results show that the four reclamation project schemes in Dongtouxia channel are all feasible, and those which preserve the existing channels and passages between islands are better schemes from the point of view of the influence on the surrounding sea area and sustainable utilization of resources.
出处
《水运工程》
北大核心
2008年第4期13-18,共6页
Port & Waterway Engineering
关键词
瓯江口
围垦工程
潮流
泥沙
数学模型
洞头峡
Oujiang estuary
reclamation project
tidal current
sediment
mathematical model
Dongtouxia channel