通过对湖南电网负荷及其特性中长期预测和电源结构规划的分析,为满足远景调峰容量的需求,建设抽水蓄能电站已提到议事日程,并介绍了六个规划选点的抽水蓄能电站的基本情况。
After analysing the present situation of power load in Hunan power network its features,and the long term prediction of the power structure,this paper suggests that power stations be built of the type generating electricity with the water pumped with the surplus power supply to meet the needs of peak load in the future.This paper introduces examples of six such power stations.
出处
《水力发电学报》
EI
CSCD
北大核心
1997年第3期1-11,共11页
Journal of Hydroelectric Engineering
关键词
抽水蓄能水电站
电站规划
湖南
Pumped storage water power\ Scheduled stations