本文以下辛店站施工为例,结合站内一体化轨道电路系统原理、有关设计要求及工程的实施情况,对其施工技术进行探讨和研究,针对站内一体化轨道电路的特殊之处,提出了具体的施工技术要求及相应技术措施,为在后续客运专线上的应用及施工提供有益的参考。
Taking the construction in Xiaxindian station as an example, the paper discusses and researches the construction technology of integrated track circuit system in station by referring to the principle of the system, the relevant requirements of design and the engineering circumstance. According to the particular item of the system, the paper brings forward the specific requirements for construction and the relevant measures, so as to provide helpful reference for the application and construction on passenger dedicated line in future.
出处
《铁路通信信号工程技术》
2008年第2期57-59,共3页
Railway Signalling & Communication Engineering
关键词
一体化轨道电路
施工技术
技术措施
Integrated track circuit, Construction technology, and Technical measures