摘要
通过对宣钢2个独立的循环水系统能力以及汽轮发电机运行现状的分析,对6MW汽轮发电机循环水系统进行工艺优化,改善了汽轮发电机组的运行条件,提高了机组运行的经济性,实现了节能降耗的目的。
Based on analysis about the capacities of two independent water circulating system and present operation of turbo generator, the system of 6 MW generator is optimized, its operation conditions improved, economic performance raised, energy- saving and consumption- reducing realized.
出处
《河北冶金》
2008年第2期59-60,3,共3页
Hebei Metallurgy
关键词
汽轮发电机
循环水系统
工艺
改造
turbo generator
water circulating system
process
reformation