期刊文献+

越南昆江2水电站金属结构布置与设计

Layout and Design of Metal Structures for Vietnam Song Con2 Hydropower Station
下载PDF
导出
摘要 文章介绍越南昆江2水电站金属结构布置和设计成果。拦污栅与启闭机、检修闸门与启闭机的连接,采用了易于存放又避免拆卸拉杆、明显节省操作时间的起重环链。拦污栅前布置液压清污抓斗进行清污。溢流坝检修闸门采用叠梁闸门,使用简易门机起吊。 Layout and design of metal structures for Vietnam Song Con 2 Hydropower Station are presented in this paper. The connections between trash rack and hoist as well as between service gate and hoist are achieved by hoisting chain that is apt to place and is time saving without tearing down pull rod. The hydraulic raking grabbing bucket is put in front of the trash rack for decontamination. The service gate of the overflow dam is designed as a stop log gate to be lifted by a simple gate.
作者 霍卫
出处 《红水河》 2008年第2期11-15,共5页 Hongshui River
关键词 闸门 启闭机 布置 设计 越南昆江2水电站 gate hoist layout design Vietnam Song Con 2 Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部