期刊文献+

海孜煤矿顶板次生离层水的形成与防治 被引量:8

Investigation on Water Hazards Caused by The Water Cell Formed by Overburden Strata Separation And Its Control in Haizi Coal Mine
下载PDF
导出
摘要 通过水文地质和工程地质条件分析、相似材料模拟和数值模拟认为淮北海孜煤矿的顶板水害为次生离层水包破裂所致,钻探和光学成像证实了分析和实验结果。针对灾害原因,采取了采动疏干的防治水方法,取得了满意的效果,确保了类似条件工作面开采的安全。 The water hazard was deduced as the cause of water cell breaking wllich was caused by over burden strata separation during mining activities according to hydrogeological and geotechnical analyses, physical analogue and numerical simulation. Drilling and borehole scanning verified the above results. To control the water hazards, the responding draining measure was taken and the tests were successful. The achievements were applied to the working faces with the similar hydrogeological condition to guarantee mining safe.
出处 《华北科技学院学报》 2008年第1期9-12,共4页 Journal of North China Institute of Science and Technology
基金 国家自然科学基金资助项目(40772152)
关键词 离层水 顶板 数值模拟 相似材料模拟 疏干 separating sell water coal roof numerical simulation physical analogue draining
  • 相关文献

参考文献5

二级参考文献9

共引文献86

同被引文献112

引证文献8

二级引证文献96

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部