摘要
从底模支架支设、底模系统预压以及外侧模、翼板底模和箱室芯模的安装到钢筋施工、混凝土浇筑,阐述了景州互通跨线桥现浇箱梁施工过程,同时简要介绍了施工过程中的质量控制措施。
Constructional process of cast-in-site box beam of interchange overpass bridge in Jingzhou is expatiated from setting structural support of bottom moulding board, preloading on system of bottom moulding board, setting outside moulding board, bottom moulding board of wing board and core moulding board to construction of reinforcing steel bar and cast-in-site of concrete. In the same time, quality control measures in constructional process are introduced briefly.
出处
《河北工程技术高等专科学校学报》
2008年第1期38-41,共4页
Journal of Hebei Engineering and Technical College Quarterly
关键词
互通跨线桥
混凝土
箱梁
现浇
interchange overpass bridge
concrete
box beam
cast-in-site