摘要
本文对鹤管收发油过程中的水力平衡模型进行了分析,对数值计算方法进行了研究,采用Visual Basic 6.0编写相关程序,对水力过程进行迭代求解,程序可用于油库设计及改造过程中的计算、分析、优化设计等环节。
Crane tube load and unload hydraulic balance model is analyzed, numerical method is researched, Visual Basic 6. 0 is used to build correspond program, iterative method is used to solve hydraulic process, the program can be used to calculate, analysis, optimize design in oil depot design and rebuild.
出处
《内蒙古石油化工》
CAS
2008年第3期32-33,共2页
Inner Mongolia Petrochemical Industry