摘要
本文通过两个具体的工程实践,结合工程实际情况进行分析,对于基础型式采用PHC管桩在试验后常出现的问题及处理方法作一些有益的探索。
This text compares through two concrete engineering practice, analysing link with practical project situation, to make some useful quest for the most frequently encountered problem and processing methods after testing the PHC tubular pile.
出处
《福建建筑》
2008年第3期43-44,100,共3页
Fujian Architecture & Construction
关键词
PHC管桩
桩基检测
处理方法
PHC tubular pile tests of pipe stake Processing Methods