整孔双线简支箱梁运输控制因素及工程措施和工期计算

Control factors,engineering measures and computation of time limit of full span double-tracked simple box girder transport
下载PDF
导出
摘要 结合京沪高速铁路制梁场设计以及京津、武广客运专线等先后开工建设的实践经验,较为系统地阐述了整孔双线简支箱梁在运输通道上的控制因素和解决的工程措施,并且提出了运梁工期的计算方法。此文论述的内容可对高速铁路及客运专线施工组织设计提供经验和指导。 Combined with the design of girder fabrication plant for Beijing - Shanghai high seed railway and the practical experience of construction which has started successively on Beijing -Tianjin and Wuhan - Guangzhou passenger dedicated lines, this article makes a relatively systematic description of the control factors of the full span double - tracked simple box girders in the transport corridor and the solution of engineering measure thereto along with the proposal for the method of computing the time limit of the girder transport. The content expounded in the article can provide high speed railways and passenger dedicated lines with experience and guidance in the design of construction organization.
作者 代中军
出处 《铁路工程造价管理》 2008年第2期1-6,共6页 Railway Engineering Cost Management
关键词 箱梁运输 控制因素 工程措施 工期 box girder transport control factor engineering measure time limit (for girder transport)
  • 相关文献

参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部