针对重阳水库大桥桩基施工的难点,从搭设工作平台、埋设钢护筒、钻孔施工等方面介绍了无覆盖层深水桩基施工,并对全桥桩基进行了超声波检测,结果表明桩身质量完好,从而为类似工程提供了参考。
In view of difficulties encountered in pile foundation construction process of bridge in Chongyang reservoir, from the erection of working platform, embedment of steel casing, drilling construction and other aspects the construction of pile foundation in deep water and in riverbed without overburden is introduced. Supersonic detection is carried out. Results show the quality of piles is good, which provide references for similar works.
出处
《山西建筑》
2008年第9期322-323,共2页
Shanxi Architecture
关键词
钢护筒
桩基
稳定性
钻孔施工
质量
steel casing, pile foundation, stability, drilling construction, quality