期刊文献+

火电厂脱硫电价研究与探讨 被引量:10

Research and discussion on the electricity price for FGD equipment in thermal power plant
下载PDF
导出
摘要 对广东省16个已投运脱硫工程的脱硫电价进行计算和分析,总结出影响脱硫电价的主要因素,即机组容量、脱硫工程的建设时期、燃料特性、脱硫装置年利用小时数及脱硫工艺等。对目前我国脱硫电价政策进行探讨,提出脱硫电价应考虑机组容量和燃料特性等因素。所得结论对于脱硫技术政策的制定和火电厂开展脱硫工程具有参考意义。 The electricity price of 16 FGD projects in operation in Guangdong Province were calculated and analyzed. Based on this, main factors contributing to the FGD electricity price were summarized as unit capacity, construction period, fuel features, annual utilization hours of FGD equipment and FGD technology. The present FGD electricity price policies were discussed; in addition, the unit capacity and fuel features should be considered in FGD electricity price, taking great reference for technical policy making and FGD project implementation.
出处 《中国电力》 CSCD 北大核心 2008年第3期71-74,共4页 Electric Power
关键词 火电厂 脱硫装置 脱硫电价 power plant FGD equipment electricity price
  • 相关文献

参考文献1

  • 1廖永进.火力发电厂烟气脱硫装置的成本研究[R].广东:广东电网公司电力科学研究院.2006. 被引量:1

同被引文献88

引证文献10

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部