1100t/h亚临界中间再热塔式直流锅炉蒸发Ⅱ段受热面管爆漏失效原因分析 被引量:3

Failure Analysis of Heating Surface Tube Bursting at Evaporation Section Ⅱof 1100 t/h Subcritical Intermediate-reheat Tower Once-through Boiler
下载PDF
导出
摘要 陕西某火力发电厂2号锅炉系引进罗马尼亚亚维可公司制造的1 100t/h亚临界、中间再热式、塔式燃煤直流锅炉,该锅炉自投运以来,蒸发Ⅱ段受热面曾多次地发生爆管泄漏,且因为应力分布不畅致使角管的密封焊缝在运行中经常撕裂,四壁的管排整体变形严重。锅炉蒸发Ⅱ段受热面爆管泄漏处管壁出现较多的纵向和环向裂纹,经过综合分析,确定爆管的原因为管子长时过热,导致材质严重恶化,并在直流锅炉角部较为复杂的应力状况作用下爆管泄漏。 The imported boiler of Unit 2 in some thermal power plant in Shaanxi, China is a 1 100 t/h subcritical, intermediate-reheat, tower coal-fired once-through boiler, which has experienced many times of heating surface tube bursting and leakage at Evaporation Section Ⅱ since being put into operation. In addition, the angular tube seal weld often cracked in operation and the tube banks around deformed seriously because of the obstructed stress distribution. A number of longitudinal and circumferential cracks were found on the burst tube wall, Upon comprehensive analysis, it is concluded that the tube bursting was caused by prolonged overheating of the tubes that led to severe deterioration of the tube material as well as by the complicated stress at the angular part of the once-through boiler.
作者 张处放
出处 《广东电力》 2008年第2期55-59,共5页 Guangdong Electric Power
关键词 蒸发Ⅱ段 爆管泄漏 性能试验 显微组织 过热 应力 evaporation section Ⅱ tube bursting and leakage performance test microstructure overheat stress
  • 相关文献

参考文献3

  • 1GB9222-1988.水管锅炉受压元件强度计算[S].[S].,.. 被引量:6
  • 2DL438-2000.火力发电厂金属技术监督规程[S].[S].,.. 被引量:18
  • 3西安热工研究院.热工技术手册第6卷:电厂金属[K].北京:水利电力出版社.1989. 被引量:1

共引文献22

同被引文献11

  • 1蔡新春,史晓华,郝宏生,王志军,李王斌,郭起旺,李兵,史联青.漳泽发电厂670t/h锅炉受热面超温爆管试验研究[J].热力发电,2004,33(10):47-49. 被引量:2
  • 2Bulloch J H, Callagy A G, Scully S, et al. A failure analysis and remnant life assessment of boiler evaporator tubes in two 250 MW boilers [J]. Engineering Failure Analysis, 2008, 67: 567-589. 被引量:1
  • 3Lawrence A, Kumar R, Nandakumar K, et al. A novel tool for assessing slagging propensity of coals in PF boilers [J]. Fuel, 2008(87) : 946 - 950. 被引量:1
  • 4Harry J M, Jan H, Noteboom W, et ah Improved plant availability by advanced condition based inspections,[J]. Int J Pressure Vessels and Piping, 2004, 81:491 - 497. 被引量:1
  • 5Erickson T A, Allan S E, MeCollor D P, et al. Modelling of fouling and slagging in coal-fired utility boilers [J]. Fuel Processing Technology, 1995, 44:155 - 171. 被引量:1
  • 6Bulloch J H, Callagy A G, Scully S, etal.A failure analysis and remnant life assessment of boiler evaporator tubes in two 250 MW boilers[J].Engineering Failure Analysis,2008(67) :567-589. 被引量:1
  • 7Lawrence A, Kumar R, Nandakumar K, etal.Anovel tool for assessings lagging propensity of coals in PF boilers [J].Fuel, 2008 (87) : 946-950. 被引量:1
  • 8Harry J M, Jan H, Noteboom W, etal.Improved plant availability by advanced condition based inspec-tions[J]. International Journal of Pressure Vessels and Piping, 2004(81 ) :491-497. 被引量:1
  • 9Erickson T A, Allan S E, McCollor D P, etal.Modeling of fouling and slagging in coal-fired utility boilers[J]. Fuel Processing Technology, 1995(44) : 155-171. 被引量:1
  • 10庞力平,孙保民,刘宇鑫,刘彤.电站锅炉水平侧包墙变形的试验研究[J].清华大学学报(自然科学版),2009,49(5):702-706. 被引量:1