摘要
介绍了深圳西部电力有限公司3号机组烟气海水脱硫原理、自动控制范围、自动控制系统调试、调试过程中遇到的问题及解决方法。
The principle of seawater flue gas desulphurization process,the autocontrol extension,autocontrol system commissioning,the problems and its solving means during the process commissioning of No. 3 units in Shenzhen West Power Co. ,Ltd are introduced briefly.
出处
《电力环境保护》
2008年第1期13-15,共3页
Electric Power Environmental Protection
关键词
烟气海水脱硫
热工自动化
程序控制
模拟量控制
seawater flue gas desulphurization
autocontrol extension
program control
simulate signal control