期刊文献+

基于可能度的第三方物流合作风险评价研究 被引量:1

Research on the cooperation risk evaluation in third-party logistics based on possibility degree
下载PDF
导出
摘要 从系统的角度,研究第三方物流合作中面临的七种风险因子,根据区间数的属性构建了基于可能度的第三方物流合作风险综合评价模型,并给出了该模型的应用算例,结果表明,该模型可以选择出风险最小的第三方物流合作方案,有利于提高第三方物流合作绩效。 From the perspective of system, researched on seven risk factors which confronted in the cooperation of third-party logistics, according to the attribute of interval number, proposed a comprehensive cooperation risk evaluation model in third-party logistics based on possibility degree, after that, gave a applied example to verify the model, the result manifested that the model could be used to choose the project with minimum cooperation risk and help to improve the cooperation performance of third-party logistics.
出处 《现代制造工程》 CSCD 2008年第2期40-43,共4页 Modern Manufacturing Engineering
关键词 第三方物流 风险评价 区间数 可能度 Third-party logistics Risk evaluation Interval number Possibility degree
  • 相关文献

参考文献13

二级参考文献67

共引文献968

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部