摘要
分析了钻孔灌注桩在钻孔或灌注水下混凝土过程中出现的问题及其处理方法。具体介绍了在灌注完成后发现的质量问题,并提出处理质量缺陷的方法和现场有效的控制措施。
Analysis is made of problems arising from boring or in-situ piling in water,with solutions thereto.The problem in quality found after casting is specifically described,with proposed methods to treat the defects and effective measures for site control.
出处
《中国市政工程》
2007年第6期64-65,76,共3页
China Municipal Engineering
关键词
基础工程
钻孔灌注桩
质量控制
foundation works
bored in-situ pile
quality control