摘要
根据广州市轨道交通6号线白沙河大桥拟采用的连续刚构梁型式,探讨了桥上无缝线路布置的3个方案,建议采用方案1,即不设钢轨伸缩调节器。
Based on the continuous rigid frame bridge planned-adopted in Baishahe Bridge in Guangzhou Metro Line 6, the three schemes for layout of continuous welded rail are explored. Scheme 1, i.e. no need to install rail expanding-contracting regulator, is suggested to apply.
出处
《现代城市轨道交通》
2008年第1期22-24,共3页
Modern Urban Transit