2Wang WC, Dzeng R J, Lu Y H. Integration of simulation-based cost model and muhi-criteria evaluation model for bid price decisions [ J ]. Journal of Computer-Aided Civil and Infrastructure Engineering, 2007 (22) : 223-235. 被引量:1
3Wang W C. SIM-UTILITY model for project ceiling price determination [ J] . ASCE Journal of Construction Engineering and Management, 2002, 128 (1) : 76-84. 被引量:1
4Lin C C, Wang W C, Yu WD. Improving AHP for construction with an adaptive AHP approach (A3) [ J ] . Automation in Construction, 2008, 17 (2): 180-187. 被引量:1
5Touran A, Wiser E P. Monte Carlo technique with correlated random variables [ J] . J. Constr. Eng. Manage, 1992, 118 ( 2 ) : 258-272. 被引量:1