期刊文献+

较差地质连拱隧道开挖方案及施工顺序的探索

Excavation scheme and construction sequence of double-arch tunnel under worse geological conditions
下载PDF
导出
摘要 通过对云南富广高速公路银厂连拱隧道施工过程的分析,并对比邻近在建连拱隧道的不同施工方法,分析了偏压连拱隧道在采用不同开挖顺序施工时各阶段围岩的应力、应变状况,得出了一些结论,为今后类似连拱隧道的施工提供了合理建议。 Based upon analysis of the construction process of Yinchang double-arch tunnel in Fu-Guang expressway of Yunnan and compared with construction method of adjacent double-arch tunnel under construction the stress and strain Status of surrounding rock under various excavation orders of double-arch tunnel with lateral pressure are analyzed. Some conclusions are obtained in order Izo provide references for similar works in the future.
作者 张保军
出处 《山西建筑》 2008年第3期332-333,共2页 Shanxi Architecture
关键词 连拱隧道 开挖方案 施工顺序 围岩 double-arch tunnel, excavation scheme, construction sequence, surrounding rock
  • 相关文献

参考文献4

  • 1夏才初, 李永盛..地下工程测试理论与监测技术[M],1999.
  • 2李世辉著..隧道围岩稳定系统分析 BMP-84程序的应用和理论[M].北京:中国铁道出版社,1991:342.
  • 3易萍丽编著..现代隧道设计与施工[M].北京:中国铁道出版社,1997:385.
  • 4余金凯.南山隧道施工技术.山西建筑,2005,31(13):143-144. 被引量:13

共引文献12