摘要
通过地处软土地基的某地铁奥—元区间的基坑施工,利用监测数据反馈信息,探讨了在软土深基坑开挖及支护施工中应注意的问题,并总结了深基坑施工的相关技术措施,可供类似工程参考借鉴。
Combined with soft soil foundation pit works in one regional tunnel of metro and based upon feedback information of monitoring data questions deserving attention in excavation and supporting construction process of deep soft soil foundation pit are discussed, in addition, related technological measures are summarized in order to provide references for similar works.
出处
《山西建筑》
2008年第4期151-152,共2页
Shanxi Architecture
关键词
软土
深基坑
时空效应
开挖
支护
soft soil, deep foundation pit, time-space effect, excavation, supporting