1Joel P. Stinson, Edward W. Davis and Bsheer M. Khumawala, Multiple Resource-Constrained Scheduling Using Branch and Bound[]]. ALLE Transaction.1987,10 252-259. 被引量:1
2N.Christofides,R.Alvarez-valdes.J.M.Tamarit,Project Scheduling with Resource Constraints: A Branch and Bound Approach, European Journal of Operational Research[J]. 1987,29: 262-273. 被引量:1
3Demeulemeester, E. L. and Herroelen. A Branch and Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem[J]. Management Science, 1992,38:1803-1881. 被引量:1
4Peter Brucker, Andreas Drexl, Roll M hring, Klaus Neumann and Erwin Pesch,Resource-constrained Project Scheduling : Notation, Classification, Models and Methods[J]. European Journal of Operational Research, 1999.112:3-41. 被引量:1
5Shigeru Tsubakitani and Richard F.Deckro. A Heuristic for Multiproject Scheduling with Limited Resources in the Housing Industry [J]. European Journal of Operational Research, 1990,49:80-91. 被引量:1
6E.William East, Infrastructure Work Order Planning Using Genetic Algorithm [C] Proceedings of the Genetic and Evolutionary Computation Conference,1999,1510-1516. 被引量:1
2TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993. 被引量:1
3KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172. 被引量:1
4TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340. 被引量:1
5SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102. 被引量:1
6LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379. 被引量:1
7OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407. 被引量:1
8TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086. 被引量:1