荷麻溪特大桥施工过程仿真分析

Simulating Analysis of the Construction Process of the Hemaxi Mega-Bridge
下载PDF
导出
摘要 为保证荷麻溪特大桥在施工过程中结构的受力和线形符合设计要求,运用ANSYS软件对施工过程进行数值分析,介绍了预应力的处理方法、单元生死特性的应用,计算出的桥梁各断面应力、索力和桥梁线形与测量结果十分接近,说明使用ANSYS可以很好的对部分预应力混凝土斜拉桥施工过程进行仿真分析。 In order to meet the designed requirements of the Hemaxi Bridge in structural strength and line-arity,a numerical analysis is made of the construction process with the ANSYS software in the paper,with the pre-stressing methods and the characteristics of the critical Element introduced,It is found that the sectional stress, cable force and linear shape of the ANSYS analysis results are totally in agreement with the measured on-site results, which proves that the ANSYS software can be used to simulate and analyze the construction processes of partially cable-stayed bridges.
作者 王红升
机构地区 上海交通大学
出处 《国防交通工程与技术》 2007年第4期64-67,共4页 Traffic Engineering and Technology for National Defence
关键词 部分斜拉桥 预应力混凝土结构 等效荷载法 空间梁单元 仿真分析 partially cable-stayed bridge pre-stressed concrete structure equivalent load method three-dimensional beam element simulating analysis
  • 相关文献

参考文献3

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部