三峡工程RCC围堰拆除爆破是在水下40 m深处进行,为了验证炮孔封堵材料的密封性和粘着抗力而进行了模拟试验,对试验的细节加以介绍。
The demolition blasting of RCC cofferdam of TGP is carried out underwater 40 m depth; the analog test is done to examine the watertightness and the bond resistance of blast-hole stems; the details are described.