摘要
在深入、全面地考虑了三峡梯级水电站群发电与各综合利用部门之间的关系后,提出了具有防洪、发电、航运和冲沙等综合利用要求的梯级水电站群日调峰运行的多层次目标优化方法,求得了三峡梯级电站群调峰应用成果。还总结了优化调峰运行的机理,对其他水电站群也具有广泛的指导和借鉴意义。
Through looking thoroughly at the relations between power generation and other comprehensive usage for the Three Gorge cascade station group, a multiple - level objective optimum method of daily peak operation is presented for the cascade station group having multi purpose, including flood control, power generation, navigation and sediment discharge, and the mechanism of optimum load peak operation is also concluded, which has a widely guiding and reference significance for other hydroelectric cascade station groups.
出处
《中国三峡建设》
1997年第7期19-21,共3页
China Three Gorges Construction
关键词
梯级水电站
调峰
优化运行
Cascade hydropower station Peak load adjustment Optimum operation