摘要
介绍了烧结余热发电在济钢第二烧结厂的应用情况,以及投产初期出现的问题和解决办法,对烧结余热发电设计、建设和运行中可能出现的问题给出了建议。
The actuality of generating electricity using waste heat from sintering process in the NO.2 sinter plant of JIGANG has been introduced in this paper.It also gave some problems occurring in the initial stage of production and their resolvents.Some suggestions on design,construction and production were given.
出处
《烧结球团》
北大核心
2007年第5期47-51,共5页
Sintering and Pelletizing
关键词
烧结
余热回收
发电
实践
sinter,recovery waste heat,generate electricity,practice