依据英买力气田群地面工程的水土保持方案,采取实地调查和现场勘察相结合的方法,对水土保持预防保护措施、工程生物防治措施、土地整治措施的实施、水土保持资金落实以及监理、监测工作的情况进行了综合评价。针对存在的水土保持工程质量以及与主体工程相比较严重滞后等问题提出了建设性意见,对促进水土保持"三同时"制度的落实具有相当的现实意义。
By means of the field investigation combined with site survey and the soil and water conservation plan for the Yingmaili Gas Fields project, the paper comprehensively evaluates precaution and protection of soil and water loss, engineering and vegetation measures, land reclamation measures, implementation of investment funds, and supervising and monitoring of soil and water loss. Some proposals concerning the problems with soil and water conservation measures such as lower quality and lagging behind the principal part of project are put forward. It is very important to enhance environment protection and carry out the soil and water conservation system in the manner of the simultaneous design, construction, and operation.
出处
《水土保持通报》
CSCD
北大核心
2007年第5期105-107,共3页
Bulletin of Soil and Water Conservation
基金
中国石油总公司"荒漠化地区水土保持关键技术研究"
关键词
英买力气田群
水土保持方案
the Project of Yingmaili Gas Fields group
soil and water conservation plan