摘要
对新建超临界机组调试冲管阶段过程中影响汽水管道和支吊架安全性的各个因素进行分析。结合计算实例和冲管实践经验,提出相应的建议。
This paper analyses the factors that affect the steam & water pipe and pipe-hanger security during commissioning flushing process for new built unit.The corresponching suggestions have been put forward based on actual calculation example and actual project experience.
出处
《湖北电力》
2007年第5期53-54,共2页
Hubei Electric Power
关键词
超临界机组
冲管
支吊架
supercritical unit
flushing pipe
pipe-hanger