摘要
文中叙述了大伙房二期输水工程的预应力钢筒混凝土管道(DN3200)制造过程中质量控制的方法、原材料质量控制的特点,并详细说明了管道配件生产过程的质量控制、技术要求和方法。
The article introduces the method of quality control in the process of manufacturing PCCP of DN 3200 and the featur of quality control of this pipe's raw material in Dahuofang Water Delivery Project (second period), and narrates the quality control, technique demand and method in the process of manufacturing PCCP'S fittings in detail.
出处
《山西水利科技》
2007年第4期49-50,59,共3页
Shanxi Hydrotechnics