介绍了宝钢自备电厂2×350MW机组作为80年代初国内首次引进整套设计、设备、施工技术、完整启动调试技术和管理以及生产管理的工程项目,从启动调试。
Pao Steel Autonomous Power Plant (2×250 MW) is China's first project with complete set of imported design and equipment,advanced construction technology,integrated commissioning test technology and management and product management at the begining of 80. It has played an important part in enlightment and promotion for enhancement of power plant equipment manufacturing,power plant design,construction technology,commissioning test and production management, A review on this valuable experiencs will certainly improve the quality of current power plant construction and commissioning test.
出处
《华东电力》
1997年第1期10-14,共5页
East China Electric Power
关键词
投产模式
发电厂
调试
宝钢
commissioning test commercial operation mode of put into operation