期刊文献+

基于工位约束快速启发式算法的混合装配线分段优化 被引量:4

Subsection Optimization on Mixed Model Assembly Lines Based on Workstation-Constrained Fast Heuristic Algorithm
下载PDF
导出
摘要 基于目前许多混合装配线多为人工装配的特点,对混合装配线改造问题进行了研究.在现有搭积木模型快速启发式算法的基础上进行改进,建立了带盒子约束可重叠搭建的积木塔模型,制定了新的搭建规则,在此基础上提出了一种适用于对原有混合装配线进行改造的带有工位约束的启发式算法;并针对混合装配线提出了分段优化的策略,将大规模问题分解为小规模问题进行研究,提高了算法的求解速度.算例验证了带工位约束启发式算法的可行性及有效性. Since many mixed model assembly lines are manual assembly, the improvement of a mixed model assembly line was studied. A clinker-built building block tower model with box restriction was developed based on the existing building block model, and a new building rule was derived. Based on this rule, a kind of workstation constrained heuristic algorithm was complied to improve existing mixed model assembly lines. One subsection optimization strategy was advanced to split big scale problem to be small ones, and this strategy quickens the execution of algorithm. The validity and applicability of workstation constrained heuristic algorithm was validated by the analysis of example.
作者 梁燕 金烨
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2007年第9期1501-1505,共5页 Journal of Shanghai Jiaotong University
关键词 混合装配线 启发式算法 分段优化 mixed model assembly lines heuristic algorithm subsection optimization
  • 相关文献

参考文献7

二级参考文献22

  • 1田兆青,来新民,林忠钦.Diagnosis of Multiple Fixture Faults in Multiple-Station Manufacturing Processes Based on State Space Approach[J].Tsinghua Science and Technology,2004,9(6):628-634. 被引量:2
  • 2BRUCKER P, JURISCH B, SIEVERS B. A branch & bound algorithm for the job shop problem[J]. Discrete Applied Mathematics, 1994,49( 1 - 3): 107- 127. 被引量:1
  • 3LAWRENCE S. Supplement to resource constrained project scheduling:an experimental investigation of heuristic scheduling techniques[R]. Pittsburgh, PA, USA: Carnegie - Mellon University, 1984. 被引量:1
  • 4ADAMS J, BALAS E, ZAWACK D. The shifting bottleneck procedure for job shop scheduling[J]. Management Science,1988,34(3) :391-401. 被引量:1
  • 5BIERWIRTH C,MATTFELD D C. Production scheduling and rescheduling with genetic algorithms[J]. Evolutionary Compu ration,1999,7 (1) :1-17. 被引量:1
  • 6KOLONKO M. Some new results on simulated annealing applied to the job shop scheduling problems[J]. European Journal of Operational Research, 1999,113(1): 123- 136. 被引量:1
  • 7WANG Ling, ZHENG Dazhong. An effective hybrid optimization strategy for job-shop scheduling problems[J]. Computers & Operations Research, 2001,28(6) :585-596. 被引量:1
  • 8BLAZEWICZ J,ECKER K,SCHMIDTG,et al. Scheduling in computer and manufacturing systems(2nd Edition)[M]. Ber lin,Germany: Springer, 1994. 被引量:1
  • 9JAIN A S, MEERAN S. Deterministic job shop scheduling:past, present, future[J]. European Journal of Operation Research, 1999, 113(2) :390-434. 被引量:1
  • 10GIRISH S, NALLAN C. Performance of hybrid cellular manufacturing systems: a computer simulation investigation [J].European Journal of Operational Research, 2000, 120 (2): 436-458. 被引量:1

共引文献33

同被引文献34

  • 1皮兴忠,范秀敏,严隽琪.基于可行作业序列的遗传算法求解第二类装配线平衡问题[J].上海交通大学学报,2005,39(7):1123-1127. 被引量:21
  • 2王丽颖,孙丽,王秀伦.基于虚拟工序的小批量工序质量控制方法研究[J].计算机集成制造系统,2006,12(8):1263-1266. 被引量:26
  • 3鞠彦兵,李桂芬,王爱华.基于遗传算法的车间作业计划仿真研究[J].数学的实践与认识,2006,36(10):79-85. 被引量:4
  • 4Hackman S T, Magazine M J, Wee T S. Fast, effective algorithms for simple assembly line balancing problems[J ]. Journal of Operational Research, 1989,37(6) :916 - 924. 被引量:1
  • 5Gutjahr A L, Nemhauser G L. An algorithm for the fine balancing problem[ J ]. Management Science, 1964,11 ( 2 ) : 308 - 315. 被引量:1
  • 6Scholl A, Becker C. State - of - the art exact and heuristic solution procedures for simple assembly line balancing[J ]. European Journal of Operational Research, 2006,168 (3) : 666 -693. 被引量:1
  • 7Lapierre S D, Ruiz A, Soriano P. Balancing assembly lines with tabu search [ J ]. European Journal of Operational Research, 2006,168: 826 - 837. 被引量:1
  • 8Baybars I. A survey of exact algorithms for the simple assembly line balancing problem[J]. Management Science, 1986, 32 : 900 - 932. 被引量:1
  • 9Johnson R V. Optimally balancing large assembly lines with FABLE[ J ]. Management Science, 1988,34: 240 - 253. 被引量:1
  • 10Klein R, Scholl A. Maximizing the production rate in simple assembly line balancing - a branch and bound procedure [ J ]. European Journal of Operational Research, 1996, 91 : 367 - 385. 被引量:1

引证文献4