摘要
介绍沈阳公和斜拉桥东侧混凝土主梁近距离跨越哈尔滨至大连电气化铁路高压线的施工防护方法。
This paper presents the construction protection method for the east side concrete main girder of Gonghe Cable-Stayed Bridge in Shenyang spanning at very close distance the hightension lines of the electrified railway from Harbin to Dalian.
出处
《桥梁建设》
EI
CSCD
北大核心
2007年第A02期75-77,共3页
Bridge Construction
关键词
斜拉桥
铁路电气化
高压线
双重绝缘
隔离
防护
cable-stayed bridge
electrified railway
high-tension line
dual insulation
isolation
protection