宣杭铁路复线东苕溪特大桥上部结构施工技术 被引量:5

Construction Techniques for Superstructure of Dongtiao Creek Bridge on Xuancheng-Hangzhou Double-Track Railway
下载PDF
导出
摘要 宣杭铁路复线东苕溪特大桥主桥为跨度112 m的下承式尼尔森体系提篮式钢管混凝土系杆拱桥,先拱后梁,在国内为首次设计施工。主拱采用缆索吊机、扣索塔架斜拉扣挂分段悬拼,系梁采用2套挂篮对称现浇施工。介绍该桥上部结构施工技术。 The main bridge of Dongtiao Creek Bridge on Xuancheng-Hangzhou Double-Track Railway is a concrete-filled steel tube basket handle through tied arch bridge of Nielsen system with a main span 112 m. The construction of the Bridge proceeded in a way that the arch ribs were erected first and the beam afterwards, and the Bridge is the first of its kind having been designed and constructed in China. In the construction of the superstructure of the Bridge, the cable cranes and cable-stayed suspension and connection method were used for cantilever segmental assembling of the main arch and the concrete of the tie beam was cast in situ symmetrically by two sets of form travelers. In this paper, the construction techniques for the superstructure are presented.
作者 贾卫中
出处 《桥梁建设》 EI CSCD 北大核心 2007年第A02期36-39,共4页 Bridge Construction
关键词 铁路桥 尼尔森体系 系杆拱 提篮拱 钢管混凝土结构 施工方法 railway bridge Nielsen system tied arch basket handle arch concrete-filled steel tube structure construction method
  • 相关文献

参考文献4

二级参考文献11

共引文献350

同被引文献18

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部