摘要
新兴铸管厂1#高炉增载基础托换在不停产、场地受限条件下进行,难度大,要求高,通过精心设计和施工,达到了预期的目的,具有较好的经济效益。本设计思路和施工方法,为同类工程提供了有益的借鉴。
Foundation underpinning has been conducted at No. 1 blast furnace with increasing of load during production and with limited site in Xinxing Ductile Iron Pipes plant. It is more difficult in construction and of high grade technical requirements in design. Through elaborating design and construction, it achieves the expected goal, and obtains well economical benefits. The design and construction method of the proiect offers beneficial references for similar proiect.
出处
《勘察科学技术》
2007年第5期39-42,共4页
Site Investigation Science and Technology
关键词
湿陷性土
高炉增载
托换设计
collapsible soil
blast furnace with increasing of load
design of foundation underpinning