工程管理的马尔可夫骨架过程建模 被引量:3

Modeling Project Management Using Markov Skeleton Processes
下载PDF
导出
摘要 在以前,一个工程项目的进程的管理问题在各工段的施工时间为相互独立且都服从负指数分布的假设下通过一个网络图化为对一个马尔可夫链的控制和优化的研究.本文在一般情况下(放弃对各工程段的时间服从负指数分布的假设)把工程项目进程的管理问题化为对一个马尔可夫骨架过程的控制和优化问题. Previously,progress management problem in a project has been studied under the presumption that the construction times for each project stage are independent of each other and also ~have a negative exponential distribtltion. And thus this problem could be transformed into the study of control and optimization for a Markov chain via a newtork diagram. This paper has relaxed the restriction that the construction times for each project stage should have a negative exponential distribution and the above problem can be transformed into the research on control and optimization of a Markov skeleton process.
出处 《数学理论与应用》 2007年第3期25-27,共3页 Mathematical Theory and Applications
关键词 工程管理 网络图 马尔可夫链 马尔可夫骨架过程 Project Management Markov chain Markov skeleton process
  • 相关文献

参考文献6

  • 1A.Azaron,H.Katagiri,M.Sakawa,K.Kato,and A.Memariani.A multi-objective resource allocation problem in PERT networks[].European Journal of Operational Research.2006 被引量:1
  • 2A.Azaron,R.Tavakkoli-Moghddam.A multi-objective resource allocation problem in dynamic PERT networks[].Journal of Applied Mathematics.2006 被引量:1
  • 3A.Azaron,H.Katagiri,K.Kato,and M.Sakawa.Longest path analysis in network of queues:dyanamic scheduling problems[].European Journal of Operational Research.2006 被引量:1
  • 4Zhenting Hou,and Guoxin Liu.Markov Skeleton Processes and Their Applications[]..2005 被引量:1
  • 5Charnes, A.,Cooper, W.W.,and Thompson, G.L.Critical path analysis via chance constrained and stochastic programming[].Operational Research.1964 被引量:1
  • 6V.G.Kulkarni & V.G.Adlakha.Markov and Markov-Regenerative PERT Networks.Ops[].Resource.1986 被引量:1

同被引文献14

  • 1王雪青,魏喆.工程管理Partnering模式中信任机制的博弈分析[J].天津大学学报(社会科学版),2007,9(1):15-18. 被引量:17
  • 2[1]A Charnes,W Cooper,G Thompson.Critical path analysis via chance constrainde and shochastic programming[J].Operations Research,1964,12:460-470. 被引量:1
  • 3[2]V Kulkarni,V Adlakha.Markov and markov-regenerative PERT networks[J].Operations Research,1986,34:769-781. 被引量:1
  • 4[3]A Azaron,R Tavakkoli-Moghaddam.A multi-objective resource allocation problem in dynamic PERT netwoeks[J].Applied Mathematics and Computation,2006,181:163-174. 被引量:1
  • 5[4]Hou Z T,Liu,G X Markov.Skeleton Processes and Their Application[M].Science Press,Beijing,& International Press,Boston,2005:13-16. 被引量:1
  • 6[5]J Martin.Distribution of the time through a directed acyclic network[J].Operations Research,1965,13:46-66. 被引量:1
  • 7[7]Alfa A S,Rao T.Supplementary variable technique in stochastic models[J].Probab Eng.Inf.Sci.2000,14:203-218. 被引量:1
  • 8V.Kulkarni,V.Adlakha.Markov and markov-regenerative PERTnetworks[].Operations Research.1986 被引量:1
  • 9A.Azaron,R.Tavakkoli-Moghaddam.A multi-objective resource allocation problemin dynamic PERTnetwoeks[].Journal of Applied Mathematics.2006 被引量:1
  • 10Hou.Z T,and Liu,G.X.Markov Skeleton Processes and Their Application[]..2005 被引量:1

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部